Friday, March 5, 2010
Thursday, March 4, 2010
Bedroom floor (part 1)
Today we undertook to get a proper floor in our new bedroom. Grace and I both had today and Friday off; she had picked up some laminate flooring last week and so there was nothing left to do but install it. There was actually something fairly important to do prior to installing the flooring. We had to find the subfloor. Witness the picture below. That's not a set up shot. That's several months' accumulation of tools, supplies, etc. which we never really quite cleaned up.
After several hours things looked like this. That's the subfloor. We hadn't seen it for a long time. It had lots of blobs of drywall mud and mounds of concentrated paint all over. After chipping and scraping for a long time we got things to the point where we could lay our flooring down properly.
We actually managed to put the bulk of the floor in today. I don't have any pictures yet but it looks great!
Saturday, February 27, 2010
Bathroom
It seems like the bulk of our time is going to be dedicated to completing the bathroom. This weekend was no exception. On Friday morning, the bathroom looked like this:
You can't tell on the "before" picture but there's no paneling on the walls. I also made a pony wall to support the side of the tub. I also finished the crown molding and Grace painted it and the window trim. I had to wire in the outlet for the tub and the timer too. Here are the "after" pictures.

Grace picked up flooring for the main room today. She and I are both off on Thursday and Friday, so we should have the floor in by next weekend!
Saturday, February 20, 2010
Bathroom floor
As we inch ever so slowly toward the completion of this project we hit another milestone today. We put down flooring in the bathroom. I had prepped the subfloor yesterday (chipped off spilled blobs of drywall mud and paint, sanded, scrubbed it clean) and early this morning I put a coat of primer on it. By noon we were laying tiles and by two o'clock the floor was in. Next comes the wainscoting on the lower walls and then the fixtures.
After
Before
Saturday, February 13, 2010
Trimming windows
Today went better. I found a real, American-made tape measure and got the rest of them trimmed up in no time at all.
I remember when we renovated our living room many years ago that it seemed like we were getting nowhere until we trimmed the windows and suddenly it looked as if we were almost finished. And then it was only a short six months or so before we were done... We should be able to do better with the addition. Time will tell.
Saturday, February 6, 2010
Trim, Tub surround
My Friday was spent installing trim in the addition. I got started in the morning and Grace helped me finish it up when she got home from work in the afternoon. After dinner we headed to Home Depot for supplies for Saturday's project. When we got back from Home Depot I caulked until midnight so that it would be ready for touch-up paint next week. We are very pleased with the way it turned out and are looking forward to trimming up the windows soon.
The reason for the above mentioned trip to Home Depot was to purchase materials for the tub surround. It's expensive stuff. We almost made a very costly mistake during installation but we figured out a way in which a three dollar piece of trim will hide a potentially hundred dollar blunder. The surround turned out great too. It still needs to be caulked and trimmed but it's starting to come together.
Saturday, January 23, 2010
Painting
One important thing that we learned was that high quality paint significantly reduces the quantity of paint that you need. We bought five gallons of paint and we finished the closet and bedroom walls with only one gallon (and the first coat takes more paint than the second.) So if anyone out there needs two, possibly three, gallons of Behr paint for cheap let us know. It's a neat color (the picture doesn't really do it justice). It's called "Toasted Almond" which, of course, tells no one anything about what color it actually is but that's what it's called. We thought that since we love both toast and almonds that this color would be great.
Saturday, January 16, 2010
Texturing
The texturing of the bedroom and closet is finished! In spite of what the pictures seem to imply, the bulk of it was done by someone else. A friend from work came over yesterday and textured the whole closet and the bedroom walls, but then we ran out of texture (and we came dangerously close to running out of beer since another friend from work came over too...). We finished off the ceiling this morning and it looks great. The look we went for was a favorite of ours, the ever popular "however it came out" and we nailed it!
The bathroom wasn't quite ready so we hope to finish that early next week.
The bathroom wasn't quite ready so we hope to finish that early next week.
Here's a picture of Grace scraping the last of the mud into the hopper. We mixed just enough to do the ceiling.
And here's one of me spraying the stuff on to the ceiling.
Kind of a cool process...
Friday, January 8, 2010
Sanding
Monday, January 4, 2010
Daniel McGinn
Daniel McGinn is the author of a disturbingly entertaining book about all things relating to real estate. He's a journalist for Newsweek. The book isn't particularly scholarly but it's not fiction either. If you watch more than two real estate shows on HGTV per week, or if you have ever gone to a real estate open house with absolutely no intention of buying, or if you compulsively grab the free real estate listing books at the grocery store - you should read this book.
Saturday, December 26, 2009
Surprise!
On Tuesday (Dec. 22), I heard a strange noise emanating from the barn as I left for work at 3:30 a.m. I was tempted to just ignore it but my conscience got the better of me and I went to check it out. (Before going to the barn I had to find a flashlight because the electricity to the barn is currently out. It went out on Monday, Dec. 21. The last time the power cut out in the barn was just before lambing season...) I found a flashlight, wandered out to the barn and discovered that Moya (Hannah's goat) had given birth to twins at some point in the night... I got Grace and Hannah up and they took care of Moya and her offspring while I went to work.
We were woefully unprepared to begin milking. Thankfully, we had milked before and this was not Moya's first freshening either. She is an awesome milker! Very cooperative, patient and a good producer. The girls had to milk her while she stood on the ground since we had gotten rid of all of our milking equipment about four years ago.
I downloaded milk stand plans, Grace picked up the necessary lumber and our bedroom addition was temporarily transformed into a work shop. I finished it off in a couple of days and now it's ready for action. It could use a coat of paint but the girls are more anxious to be able to milk a little more comfortably.

Friday, December 18, 2009
Heat
Why is it that whenever I have to do anything under the house it inevitably involves the longest possible distances of crawling, wriggling, etc? I hate having to do stuff in the crawlspace but if we wanted heat in our new bedroom it had to be done.... Also Grace is taping and mudding in there and when the temperature is hovering around absolute zero it not only affects her ability to work but also the ability of the tape to stick and the mud to dry (as opposed to simply freezing...)
I was going to get started on the duct work last week. I had mapped out where we wanted registers, taken measurements, made a rough sketch and figured out how much and what kind of materials we would need. I went to Home Depot in Abbotsford and was confronted with a plethora of different sizes of duct work. I panicked and went home. I waited at the border for thirty minutes before I could explain to the guy at the booth that I didn't get anything at Home Depot because I didn't know what size ductwork I needed. He seemed a little leery of my explanation and seemed to be on the verge of pulling me over and searching the van (and my person) for illegal drugs... but he didn't.
I got home and figured out that it was six inch ducting that I needed. (I had to crawl under the house to figure this out. Ugh!) I decided I would just go to Lynden Sheet Metal to get my materials since I didn't want to cross the border again. When I got there the helpful receptionist told me that my little sketch was the dumbest layout she'd ever seen and that only an idiot would do it that way. (She was nicer about it but that was what I took away from our conversation...) So I went home again, modified my plan, refigured my material needs and by then the day was pretty much done.
Grace and I picked up the ductwork on Saturday night at Lowes in Bellingham. I got started today (Friday) and realized that five foot lengths of six inch ductwork aren't as bendy as I need them to be in certain instances. I needed to go get some more 90 degree fittings (which can be made to do amazing things since they're all twisty...)
We picked up some more parts on our way to Seattle to pick up Sara and by Saturday I was going full tilt. To make a long story short (and let's face it, without pictures most of you have stopped reading by now anyway...), it took me all day (Sat.) but I got heat to the addition.
I was going to get started on the duct work last week. I had mapped out where we wanted registers, taken measurements, made a rough sketch and figured out how much and what kind of materials we would need. I went to Home Depot in Abbotsford and was confronted with a plethora of different sizes of duct work. I panicked and went home. I waited at the border for thirty minutes before I could explain to the guy at the booth that I didn't get anything at Home Depot because I didn't know what size ductwork I needed. He seemed a little leery of my explanation and seemed to be on the verge of pulling me over and searching the van (and my person) for illegal drugs... but he didn't.
I got home and figured out that it was six inch ducting that I needed. (I had to crawl under the house to figure this out. Ugh!) I decided I would just go to Lynden Sheet Metal to get my materials since I didn't want to cross the border again. When I got there the helpful receptionist told me that my little sketch was the dumbest layout she'd ever seen and that only an idiot would do it that way. (She was nicer about it but that was what I took away from our conversation...) So I went home again, modified my plan, refigured my material needs and by then the day was pretty much done.
Grace and I picked up the ductwork on Saturday night at Lowes in Bellingham. I got started today (Friday) and realized that five foot lengths of six inch ductwork aren't as bendy as I need them to be in certain instances. I needed to go get some more 90 degree fittings (which can be made to do amazing things since they're all twisty...)
We picked up some more parts on our way to Seattle to pick up Sara and by Saturday I was going full tilt. To make a long story short (and let's face it, without pictures most of you have stopped reading by now anyway...), it took me all day (Sat.) but I got heat to the addition.
Saturday, November 21, 2009
It's in and it works!
The picture may be a little grainy but below is photographic proof that we managed to get our bedroom door installed today! We finished framing it up this morning and by lunch we were jamming shims all over the place and hammering nails into the jambs... and before you know it we had a door! And it only took us one try! We were waiting for it to fall out all afternoon or to get stuck closed or something - but it didn't!
We also almost finished all of the drywalling. A few more small pieces here and there and we will be ready to tape and mud.
We also almost finished all of the drywalling. A few more small pieces here and there and we will be ready to tape and mud.
Friday, November 20, 2009
It's getting door-ier in here!
This is from Monday. I played hooky from work. Grace had the day off too and so we worked on the addition some more. This view is from inside the addition. I almost finished framing the rough opening for the door today. (I also rewired the outlet that would have been in the middle of the doorway. It's now safely out of the way about three feet to the left.)
Tonight, after scouring through the inventory at the ReStore (recycled building materials) and the Buyer's Market (surplus building materials), we picked up a door at Home Depot . We hope to have the door hung by tomorrow.
Tonight, after scouring through the inventory at the ReStore (recycled building materials) and the Buyer's Market (surplus building materials), we picked up a door at Home Depot . We hope to have the door hung by tomorrow.
Saturday, November 14, 2009
Doorway (ish...)
See that small section of weather-beaten Tyvek pictured below? That poor piece of Tyvek has been waiting for almost a year to be put to good house-wrapping use. During that year it was buffeted by winds, wrapped up and nailed to the wall, urinated on by dogs and suffered various other indignities. Why was it waiting you ask? It was waiting because until today the small section of wall that it was supposed to cover did not exist. Today that wall came to be. This was the opening by which we have accessed the addition ever since the rest of the walls have gone up. Today we put up three studs, hammered some sheathing on, and wrapped it up. No more can we access the addition via the front porch. How do we get into the addition you ask? Read on, MacDuff...
Witness below. It is a hole cut through the wall of the entryway of our house. When you look through that hole you can see part of my head and part of Grace. That's right; this opening is the small beginning of a doorway into the addition from our house. It will eventually be enlarged to more door-like proportions but it's exciting to get a bit of an idea what things will look like.
One snag (there's always a snag). See just to the bottom left of the "doorway"? That's an outlet. It would have ended up in the middle of our doorway if we continued according to plan. Given the options of having an electrical outlet in the middle of our bedroom door or crawling under the house to reroute some wiring, we opted for the latter and this will be taken care of in due time.
Wednesday, November 11, 2009
Drywall
We passed our insulation inspection on Monday. Yay!
Today Grace and the kids had the day off (Veterans' Day) and so they began to drywall the walls. Actually Grace didn't have to do too much other than direct traffic since Jesse supplied two workers. Thanks, Austin and Kyle-from-Ohio! They ended up getting quite a bit done by the time I got home from work and then Grace and Paige hung a few more sheets tonight. It's probably about half done so we are well on our way!
Here's a fake action shot of Kyle-from-Ohio, Jesse and Austin.
Saturday, October 31, 2009
more insulation...
Last week found us in the attic of the addition hurling bats of R38 insulation around. Yesterday I placed them in their proper positions and, just like that, it looked like we had made all kinds of progress!
Not ones to rest on our laurels, this morning (and afternoon) found us in the crawl space under the addition inserting bats of R30 insulation between the floor joists.
Once we had accomplished that task, we went inside the addition and stuck bats of R21 insulation in between the wall studs. Then we got sick of it and quit before finishing it off...
We are dirty. Our skin itches and our eyes burn. It's time for a shower. All in all a good day.
Not ones to rest on our laurels, this morning (and afternoon) found us in the crawl space under the addition inserting bats of R30 insulation between the floor joists.
Once we had accomplished that task, we went inside the addition and stuck bats of R21 insulation in between the wall studs. Then we got sick of it and quit before finishing it off...
We are dirty. Our skin itches and our eyes burn. It's time for a shower. All in all a good day.
Saturday, October 24, 2009
Insulation
Saturday, October 17, 2009
Ceiling drywall...
It was a miserable, rainy, windy, cold, typical northwest Washington fall day today. Until this point in our addition project, weather like this would mean not working on the addition at all. But those days are all in the past because now (insert drumroll here) - we are working inside! Today we got most of the ceiling drywalled!
I went to Lowes on Friday night and picked up 10 4x8 sheets of half inch drywall. I backed the van right up to the front walk so that we could get going right away this morning. We hauled the sheets in as we needed them so as not to overly clutter things up.
Here is a "before" shot. Grace and I are just about to heave the first sheet up to the ceiling.
After briefly trying to man-handle a 4x8 sheet of drywall up against the ceiling joists and then attach it, we remembered that the last time we had installed drywall on a ceiling we had two kids helping us. Since there were no children available to press into service, we called Westside Building Supply in Lynden and rented a drywall jack. It looks like a medieval torture device but in actuality, after fire and the wheel, it is the greatest thing ever invented... This sped things up considerably (as well as saving our backs and shoulders.)
The drywall jack was terrific. I will never drywall a ceiling without one again! Here it is in action. We just tacked the sheets up along their edges because we had to get the jack back to Lynden by 4 p.m.
Finally, the fruits of our labors. We left the two foot strip open because we've got to shove insulation up there yet. We figure we can finish off these smaller sections without the jack.
So, after months of seeming inactivity, we are back in "addition mode". Hopefully by the end of next week Saturday, we will have it insulated and the ceiling drywall completed.
I went to Lowes on Friday night and picked up 10 4x8 sheets of half inch drywall. I backed the van right up to the front walk so that we could get going right away this morning. We hauled the sheets in as we needed them so as not to overly clutter things up.
Friday, October 9, 2009
heading into fall (again...)
Ok, so I'll admit it - there's a bit more to this whole "addition thing" than we realized when we committed to it. But, we're past the point of no return and so we soldier on. We're not discouraged or anything, we've just had to revamp our deadline goals to adjust to the realities of lack of time, motivation, skill, etc. Regardless, we consider ourselves to be "on track". (No smart alecky comments please...)
As you might have guessed from the lack of blog activity, we had kind of a slow summer.(Someone asked me a few weeks ago whether I'd been having any "additional thots" lately.) We actually got quite a bit done. It only seems like we haven't been doing much due to no blog posts. Also, most of the things we completed were things I had already written about as if they were done. (You'll remember we are fairly notorious for not getting things "all the way" done.)
Our rough electrical is finished and has passed inspection as has our rough plumbing. We timed it so that the inspections were done at the beginning of autumn. This way we have a full six months before another inspection is necessary. That's something we've learned since last year - we won't need an extension for our building permit when spring arrives.
Currently we are putting up insulation and beginning to ponder punching a doorway into our exisiting house so that the addition can be accessed from inside during the winter. Right now we get in through a piece of missing wall beside the front porch. It will seem weird to be able to get to the addition without going outside. This way we can get some of the inside work done during the course of the winter. On the negative side, this means mess getting tracked into the house...
There you have it. Things are moving right along.... slowly but surely...
As you might have guessed from the lack of blog activity, we had kind of a slow summer.(Someone asked me a few weeks ago whether I'd been having any "additional thots" lately.) We actually got quite a bit done. It only seems like we haven't been doing much due to no blog posts. Also, most of the things we completed were things I had already written about as if they were done. (You'll remember we are fairly notorious for not getting things "all the way" done.)
Our rough electrical is finished and has passed inspection as has our rough plumbing. We timed it so that the inspections were done at the beginning of autumn. This way we have a full six months before another inspection is necessary. That's something we've learned since last year - we won't need an extension for our building permit when spring arrives.
Currently we are putting up insulation and beginning to ponder punching a doorway into our exisiting house so that the addition can be accessed from inside during the winter. Right now we get in through a piece of missing wall beside the front porch. It will seem weird to be able to get to the addition without going outside. This way we can get some of the inside work done during the course of the winter. On the negative side, this means mess getting tracked into the house...
There you have it. Things are moving right along.... slowly but surely...